Water Supply Industry Interpretations and Advice

  • Area of Interest : Notification
  • Topic : Pumps
  • Title : Requirement to notify the proposed installation of a pump
  • Clause Reference : Regulation 5
  • Reference Number : N04
  • Decision Date : February 2015

The requirement to notify the proposed installation of ‘ a pump or booster drawing more than 12 litres per minute, connected directly or indirectly to a supply pipe’ applies to all pumps capable of delivering any flow rate greater  than 12 litres per minute.